page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44 page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
< prev - next > Transport and infrastructure Road building roadworks in emerging economics 2012 (Printable PDF)
Intermediate Equipment Handbook
Intech Associates
1.4 THE EQUIPMENT COST MODEL
How to Cost a Piece of Equipment using the models in PART 2 of this Handbook.
Investigations for the MART programme have shown that there are widespread
difficulties with equipment costing. These are due to a range of problems which include:
lack of awareness/consideration of all cost components,
lack of recorded data on actual costs, use and performance,
uncertainties regarding future market, costs, economic life, and utilisation, and
insufficient commercial pressures on decision making.
With the trend towards contractor implementation of road works (and possibly
intermediate equipment hire) it becomes essential that contractors, client’s
representatives and other users become aware of the true costs of equipment
ownership and operation. Where different cost components are managed in separate
departments/accounts (e.g. investment, replacement, workshop support and operation)
it is particularly important to appreciate the cost implications for each component.
When costing the equipment component of a piece of work there are two stages to the
process:
Stage 1. Determine the Cost of Provision of the equipment (to make it AVAILABLE)
Stage 2. Determine the Output or Productivity of the piece of equipment (the
UTILISATION)
The guidelines in this Handbook focus on Stage 1 of the process and should be of
particular interest to plant owners or hirers, whether they are contractors, road agencies
or specialist equipment hirers etc..
A further range of assumptions has to be made regarding the UTILISATION of the
equipment and prediction of how much work it will actually produce. This second stage
of the costing calculation is comparatively simple, however this also requires local data
to be collected on actual field experiences as productivity will vary depending on factors
such as local traditions, operator skill and motivation, site characteristics, logistics,
material and weather conditions, seasonal factors etc. Detailed guidance on this part of
the costing process is NOT provided by this Handbook.
PART 2 of this Handbook contains the cost model sheets necessary to calculate the
various cost components and the overall costs of PROVISION of a piece of equipment
(Stage 1). The costing method is designed to include all cost components relating to the
ownership, operation and overheads components. The approach may be used for any
type of intermediate or heavy equipment. Three sheets (1, 2 & 3) are all that are
required to carry out the Stage 1 costing of a piece of equipment. For some equipment
types an example of the calculations on sheet 3 are provided (these are shown on
Example Sheet 3).
October 2012
43